- Principle:
- Cedar Woods Properties
- Contractor:
- Shadforth Civil Contractors
- Contract Period:
- 3+ years
PROJECT SCOPE
Ellendale master planned community covers a 227 hectare site with an estimated 980 allotments ranging from 300-800sq to be completed in 10 stages. Stage one has been completed with stage two currently under construction.
Services:
Completed works stage 1
- 120,000m3 cut to fill completed under AS 3798 level one requirements
- Compaction control testing to BCC specifications for 3000m of PE sewer, 1613m of stormwater pipe and 1441m of PE watermain
- Geotechnical investigations for design parameters for 6,245m2 of retaining walls
- Consolidation Settlement Assessments
- Geotechnical stability assessments